John Murray

Posted on: February 11th, 2017 by basementsloveus

“The job took two days and involved significant work to prepare the site, including demolition of paneling and removal of a number of shelves in our mud room. They trenched out about 60 feet of cement flooring and installed the necessary tubing, protection, crushed stone for filtration and cemented the trench again. They also installed a sump pump and a back-up sump pump and included a clean out valve and a freeze stop for external discharge. They installed a flow well system to insure that the water would drain away from the house. They also did mold remediation. Courteous workmen who left the place in neat order. They answered all of our questions.”